Early streamer emission rods
Early streamer emission air terminal, 60µsec. triggering advance time
- Reference
Early streamer emission (ESE) terminal with 60μsec. triggering advance time (Δt). The strike tip and the high voltage control section are made of stainless steel. The ESE significantly reduce the charge particles ionization process in comparison with standard standard lightning rods. With a total length of 2150mm, its high voltage control section is 1500mm. It is delivered with its collar for an easy mounting on either a 30mm tape or a 8mm dia. round conductor. The ESE complies with the NCF17-102:2011 standard
Mounting:
The ESE is installed at a height of 2m min. above the highest structure presents in the protected area
The mounting is straightforward using our mast brackets, mast extension or free-standing air terminal support.
Features:
The protection radius according to NFC 17-102:2011 depends on the height and the level of protection to be reached:
H (m) | 2 | 3 | 4 | 5 | 6 | 10 | 15 | 20 | 30 | 45 | 60 |
Level I | 32 | 48 | 63 | 79 | 79 | 79 | 80 | 80 | 80 | 80 | 80 |
Level II | 34 | 52 | 69 | 86 | 87 | 88 | 89 | 89 | 90 | 90 | 90 |
Level III | 39 | 58 | 78 | 97 | 97 | 99 | 101 | 102 | 104 | 105 | 105 |
Level IV | 43 | 64 | 86 | 107 | 107 | 109 | 111 | 113 | 116 | 119 | 120 |
Protection radius for installations classified for the protection of the environment (ICPE):
H (m) | 2 | 3 | 4 | 5 | 6 | 10 | 15 | 20 | 30 | 45 | 60 |
Level I | 19 | 23 | 37 | 47 | 47 | 47 | 48 | 48 | 48 | 48 | 48 |
Level II | 20 | 31 | 41 | 52 | 52 | 53 | 53 | 53 | 54 | 54 | 54 |
Level III | 23 | 35 | 47 | 58 | 58 | 59 | 60 | 61 | 62 | 63 | 63 |
Level IV | 26 | 38 | 52 | 64 | 64 | 65 | 65 | 68 | 70 | 71 | 72 |
Data sheet
- Material
- A2 (304) Stainless steel
- Diameter (mm)
- 28
- Length (m)
- 2.15
- Weight (Kg)
- 3.50
- Standard of reference
- NFC 17-102 : Lightning protection - Lightning protection systems with iearly streamer emission
- HS code
- 73064020
- Order code
- 246382
Products that you might need
-
Default
⚡ MALTEP Participates in the Senegalese power grid development project ⚡VINCI ENERGIES and SENELEC launched work on the second phase, called Pôle 2026, of the Senegalese electricity network development project
-
Default
⚡ Now online: Welding equipment storage case⚡Protect your welding equipment from handling and storage incidents and make it easy to store.